Your team can produce a draft claim, but the owner wants a signed cover sheet, line detail, and a record of why the last submission changed. Choose construction billing software by testing the owner’s submission requirements and the accounting handoff on the same billing period. Ask to see the files and status history your team could keep after the period closes.
QuickBooks Online is a candidate when the owner accepts an estimate-based invoice. Evaluate Procore when your team bills from its prime contracts and needs exportable owner packages. Consider Oracle Textura Payment Management when participants are expected to submit and approve draws in a shared project workflow. The owner’s required submission channel sets the scope of the comparison.
Start with the package and approvals your owner requires
Get a prior accepted submission and the current contract instructions. AIA Contract Documents describes its G702 and G703 payment application forms as an application and certificate paired with a continuation sheet. Confirm the exact forms, signatures, attachments, and file types your owner accepts. A feature called progress billing may describe a percentage invoice or an application for certification.
- Have the billing coordinator export the package with their regular permissions. A vendor-admin demo can conceal a role restriction on the person who bills.
- Return a claim with one supporting file rejected. Check whether the first submission stays identifiable and the corrected version can be exported with its own evidence.
- Hand the accepted claim to accounting and reconcile the identifier and amount. An export that omits the contract or period can force staff to guess which receivable it belongs to.
Compare three ways to submit and keep the claim
QuickBooks Online for estimate-based invoicing
Intuit’s progress invoicing instructions describe creating successive invoices against an estimate and monitoring the billed amount. Start here if the owner accepts that invoice and you can meet any separate evidence requirements through an existing process. Keeping billing in accounting can make sense when the receivable already lives there.
Have the coordinator demonstrate how they would retain the owner’s evidence and the accepted revision alongside the invoice. Intuit’s instructions document the estimate and invoice workflow. Confirm a separate process for any owner-specific certificate or continuation sheet if that workflow does not produce the accepted package.
Procore for owner invoices from prime contracts
Procore’s owner invoice export instructions document CSV, PDF, and PDF-with-attachments options. Evaluate it when your team keeps the prime contract and owner invoice in Procore and needs a package it can send or archive. The instructions specify project-level Prime Contracts admin permissions for the export.
Test the export from your actual setup. The documented PDF-with-attachments option is unavailable when Procore is used with DocuSign, and only PDF attachments can be merged into a single PDF in the documented export. If the owner requests a single signed file, have the coordinator assemble and retain it in the demonstration. Check which version of the workflow is available in your account.
Oracle Textura for a shared draw workflow
Oracle’s general contractor draw documentation covers submitting owner invoices and printing draw documents. Evaluate Textura when the GC and owner are expected to work in a shared draw and need to route invoices for review there.
Oracle’s common owner workflow also shows how the invoice reaches the owner’s approvers.
Confirm who can retrieve the issued documents and how they are retained for accounting or an audit. Oracle’s general contractor project tools instructions describe printing draw documents and generating a document archive. Test which files and approval records your role can retain for the period, especially if the owner administers the project.
Bring billing and accounting records into one workspace
Start with a sample contract register and the related accounting export. Identify the references you can use to match the records.
Run one returned claim through each finalist
Use a hypothetical owner claim for $48,000. The owner returns it because an attachment supports $3,000 less than the original line item. Assume the owner accepts a revised $45,000 claim, the amounts are net of any adjustments, and accounting records the accepted amount under this company’s policy. Have each finalist issue the first package, retain it, and produce the accepted package with the replacement evidence.
Ask the billing coordinator to retrieve the returned package and the accepted one without relying on an inbox search. Then ask accounting to identify which claim and amount it should use and show where to see the reference later. The construction pay application walkthrough covers the separate calculation for a period claim. Here the decision is whether your workflow preserves the amount and evidence across submission, correction, and handoff.
Use the same projects, billing roles, approval needs, accounting system, and support period when requesting quotes. Include modules, setup, and any manual work needed to retain an accepted package. Confirm whether the proposal covers importing open contract records and the accepted balances from the schedule of values. Keep the current system if it passes the test and your team can sustain the handoff.
Ask what happens after a returned claim has already reached an accounting queue. The demonstration should show whether staff can spot the pending correction and identify the accepted package without creating a duplicate receivable. If the integration is optional, price it separately and have accounting confirm the manual handoff it would replace.
How Permute reconciles claims to accounting evidence
Permute is the context layer we sell between a business’s data and the AI tools its people already use. We can bring supplied billing exports together with connected accounting records and a register of issued packages using agreed contract, period, and revision references.
We can apply your definitions for submitted, accepted, and posted. A controller could review which accepted claims still need reconciliation and inspect the issued amounts and accounting records within their permissions. The review can reuse the same rules across projects that submit through different owner workflows.
Owners and accounting still act in their designated systems
We read from the systems we connect and do not write back to systems of record. This workflow depends on accessible billing records or exports. Your team follows the owner’s process to issue and certify claims, and accounting handles posting or payment in the designated systems.
Choose software that can produce the package your owner accepts. Use a returned claim to see whether the coordinator can preserve the original, export the accepted revision, and hand the right amount to accounting. Compare quotes for the roles and configuration that made the test work. Keep the existing workflow when it already meets those requirements.
Review the gap between owner billing and accounting
Bring a returned claim and its accounting record to map what your controller needs to reconcile the period.
Questions about choosing owner billing software
Can I keep my accounting software when an owner specifies a billing portal?
Yes, if your process can preserve the accepted portal package and connect it to the correct accounting record. Confirm who retrieves the accepted revision and what identifier the team uses on both sides.
What prior billing records should a finalist import during a migration test?
Use the last accepted application and the associated line balances for one open contract. Ask the finalist to show how those balances carry forward into the first draft in the new workflow.