Manufacturing / Excel, PDF & CSV
Plan order quantities, production hours, and work-center capacity. Download an Excel workbook with formulas, a printable schedule, and an editable CSV.
Use this manufacturing production schedule template to review a proposed schedule for one planning period. The Excel workbook calculates run hours from quantity and units per hour, adds setup hours, and compares scheduled hours with available hours by work center. Material availability, due dates, and release decisions remain visible review inputs.
Order / operation · Work center · Due date · Qty / unit · Units / hour · Setup hours · Total hours · Material / issue
5 blank rows in the printable PDF. Use another sheet when you need more space.
Work center · Available hours · Scheduled hours · Remaining hours · Owner / action
3 blank rows in the printable PDF. Use another sheet when you need more space.
Print the PDF at actual size on US Letter paper. The CSV is a blank input sheet with column headers; it has no formulas, macros, or automatic refresh. Open it in Excel or import it into Google Sheets, then save a dated copy with your evidence.
The Excel workbook includes formulas in labeled output columns and shaded cells for your inputs. Keep formulas intact, complete each active row, and review the calculated results before sharing. It contains no macros and does not connect to source systems.
The workbook compares hours within one period. It does not optimize sequencing, calculate material requirements from a bill of materials, or confirm that orders can finish by their due dates. Work centers with different resources need their own capacity definition; the template does not release production orders or control equipment.
Bring orders, inventory, and capacity records into repeatable reporting.
Explore Permute for Manufacturing